Volume 40 - Issue 30 - July 29, 2021
State of Kansas
Department of Transportation
Notice to Consulting Firms
The Kansas Department of Transportation (KDOT) is seeking qualified consulting engineering firm(s) for the project listed below. Interested consulting firms must: (a) be prequalified by KDOT or otherwise demonstrate qualification in the following category: Category 212 Highway Design Minor Facility. A PDF must be emailed to David Lutgen, P.E., Contracts Engineer at kdot.designcontracts@ks.gov. Responses are to be limited to eight pages, the subject line of the reply email and the file name must read “Guardrail Set-Aside Program – Firm Name.” Request for Proposals (RFPs) must be received by August 13, 2021, for the consulting firm to be considered.
If a firm is not currently prequalified by KDOT a response may still be submitted. Firms not prequalified must also provide documentation that demonstrates the firm is qualified for each specified category listed in this notice for the project. Firms may use the KDOT prequalification form to provide this documentation. KDOT 1050 Prequalification category definitions (Blue Book) can be found at http://www.ksdot.org/descons.asp. All firms doing business with KDOT must be registered and in good standing under the laws of the State of Kansas at the time of contracting and must comply with applicable state and federal laws, rules, and regulations.
Project
The KDOT guardrail set-aside program is a program to remove/replace all blunt end guardrail terminals on the National Highway System (NHS) in Kansas.
Scope of Services to be Performed
Prepare construction drawings and summary memos for a 2023 FY construction letting for the locations shown on the attached list.
One consultant will be selected for this project.
Project Bundle | Fiscal Year | Route | County (No.) |
---|---|---|---|
15 | 2023 | US-56 | Edwards (24) |
16 | 2023 | US-56 | Pawnee (73) |
16 | 2023 | US-56 | Pawnee (73) |
16 | 2023 | US-56 | Pawnee (73) |
20 | 2023 | US-54 | Woodson (104) |
23 | 2024 | US-169 | Anderson (2) |
23 | 2024 | US-169 | Anderson (2) |
23 | 2024 | US-169 | Anderson (2) |
23 | 2024 | US-169 | Anderson (2) |
24 | 2024 | US-169 | Anderson (2) |
25 | 2024 | US-166 | Chautauqua (10) |
25 | 2024 | US-166 | Chautauqua (10) |
25 | 2024 | US-166 | Chautauqua (10) |
25 | 2024 | US-166 | Chautauqua (10) |
26 | 2024 | US-166 | Montgomery (63) |
26 | 2024 | US-166 | Montgomery (63) |
26 | 2024 | US-166 | Montgomery (63) |
28 | 2024 | US-169 | Montgomery (63) |
Anticipated Schedule for Subsequent Events
RFPs are due by 12:00 p.m. (CST) August 13, 2021. Evaluation and ranking of technical proposals on or about August 25, 2021, after which time all firms that submitted will be notified of the ranking. Negotiations with the most highly ranked firm to commence on or about September 15, 2021. Agreement in place and in effect October 6, 2021. RFPs are to be delivered via email to kdot.designcontracts@ks.gov.
Instructions for Proposal
No costs shall be contained in the RFP. The RFP must not exceed eight (8) pages total to address the pertinent topics. Please use the following naming convention for submittal…Guardrail Set-Aside Program – Firm Name. RFPs submitted will consist of the proposal and a completed and signed Special Attachment No. 7 (“Certificate of Final Indirect Costs”), a completed and signed Special Attachment No. 8 (“Tax Clearance Certificate”), and a completed and signed Special Attachment No. 10 (“Policy Regarding Sexual Harassment”). Subconsultants will need to complete these attachments as well. All these forms are attached to the original email announcement.
RFPs shall describe any processes or procedures, including best practices, that will be used to perform tasks and to produce deliverables described above under “Scope of Services to be Performed.” Also, include items such as:
- Project manager/engineer in charge
- History of projects with similar tasks
- Availability of staff to meet schedule without overtime
- Familiarity with KDOT standards and content
- Any subconsultant and their role (if any) that will be performing services on the project
Evaluation Factors
RFPs will be evaluated based on the factors listed below, evenly weighted, to rank the most qualified firm in order of preference as first, second, third, etc. Evaluation factors: 1) the quality and completeness of the response; 2) qualifications and experience of consultant design personnel/manager proposed for services; 3) proposed project approach; 4) availability to respond to the work; and 5) past performance history for similar projects/services for KDOT. The highest ranked firm will be asked to enter into negotiations with KDOT for an agreement. In the event KDOT cannot reach agreement with the ranked firm, it will terminate negotiations with such firm and commence negotiations with the next highest ranked firm, and so on, until either agreement is reached for a satisfactory scope of services for a fair and reasonable price, or KDOT decides to pursue other alternatives.
Exhibits to this RFP
- Special Attachment No. 7 (“Certificate of Final Indirect Costs”)
- Special Attachment No. 8 (“Tax Clearance Certificate”)
- Special Attachment No. 10 (“Policy Regarding Sexual Harassment”)
Contract Terms and Conditions
A standard KDOT agreement for engineering and technical services will be used for this project. Special Attachments for the Kansas “Tax Clearance Certificate,” the “Certification of Final Indirect Costs,” and the Special Attachment No. 10 (“Policy Regarding Sexual Harassment”) will also eventually become attachments to the contract.
Questions about this RFP shall be sent by email to KDOT at kdot.designcontracts@ks.gov.
Calvin E. Reed, P.E. Director
Division of Engineering and Design
Doc. No. 049326